At a glance

Who
Homeowners holding two or more bids for a remodel or addition.
What
Line up scope, materials, permits, timeline, payments, change orders and warranty side by side before you look at price.
When
After you have the written bids and before you sign any of them.
Where
Your own kitchen table. A licensed contractor's estimate should be in writing and detailed.
Why
Two bids for the same project can differ by thousands, and the gap is usually in what each one leaves out.

Compare scope before price

Put the estimates side by side. Start with the scope of work, not the total. Does each one cover the same rooms, the same demo, the same repairs and the same cleanup?

Hildebrand's pricing page names four things that move a remodel's price: materials and finishes, size and scope, structural and permit work, and existing conditions. Use those four as your first filter. If one bid is far lower, find out which of them it quietly changes.

Write down what you asked for before the bids come in. Then check each estimate against your own list. If you asked for new flooring in the kitchen and one bid never mentions it, that bid is not cheaper. It is shorter. Ask every contractor to bid the same scope, and ask each one to list anything they left out on purpose.

It also helps to keep the bids in the same order and format. Put each one in a folder, highlight the total, and then highlight each line that is different from the others. The highlights show you where to ask questions.

A table to fill in

Copy this into a note or a spreadsheet. Fill one column per bid.

What to compare on each estimate
LineWhat to look for
ScopeRooms, demo, repairs, cleanup and haul-away all named
MaterialsBrand, model or grade named, not just "tile" or "cabinets"
AllowancesAny amount set aside for items you have not picked yet, and what happens if you spend more
PermitsWho pulls them and whether the fees are included
TradesWho does plumbing and electrical, and who manages them
TimelineStart and finish stated, and what could change them
PaymentsA schedule tied to finished stages, not a big amount up front
ChangesA written change order before extra work
WarrantyWorkmanship warranty in writing, plus manufacturer warranties
LicenseNumber listed, and it checks out at myfloridalicense.com

Want a bid you can compare?

Leave your name and number. We call back by the next business day to set up a free in-home visit and a detailed written estimate.

Prefer to talk now? Call or text (941) 284-2218.

Allowances and exclusions hide the gap

An allowance is a set amount for something you have not picked yet, like tile or a faucet. A low allowance makes a bid look cheap. Then you pick a nicer tile and the difference lands on you. Ask each contractor what the allowance buys.

An exclusion is something the estimate says it does not cover. Common ones are drywall repair, painting, permit fees, and fixing problems found after demo. Read the fine print on every bid. If it says nothing about an item, ask.

Paperwork that should match

The contract should look alike across bids on the points Florida law cares about. For a direct contract over $2,500 on a home with up to four units, section 713.015 requires a bold, capitalized lien-law notice that you sign and date. If one contractor's paperwork lacks it, ask why. Read our lien law guide for what it means.

Check each license on myfloridalicense.com. The page lets you search by name or license number. Then ask each contractor the same list of questions so the answers are comparable.

Timeline and payments

Two bids can look the same on price and still be very different on timing and cash. Check the start date, the finish date and what each one depends on. A bid with no schedule gives you nothing to hold anyone to.

Then check the payment schedule. It should tie each payment to a finished stage of work. A large first payment before anything has happened puts your money at risk. Ask each contractor to show you, line by line, what is due and when. Hildebrand's pricing page says its payments are milestone-based and written into the contract before any work begins, so ask every contractor for the same.

What to do when the bids are far apart

Ask the high bidder and the low bidder to walk you through their numbers. A good contractor can explain every line. If the low bid is missing something, ask for the price with it added back in. Then compare again.

Do not pick on price alone. The cheapest bid is not always the best value, and the most expensive is not always the safest. Pick the one you understand best, from a contractor with a license that checks out and a warranty you can read. For rough price ranges to help you judge whether a bid is realistic, see our remodel budgeting guide.

Warning signs in an estimate

  • One lump-sum number with no scope behind it.
  • Materials listed as "tile" or "cabinets" with no grade, brand or model.
  • No mention of permits, or a line that says the homeowner will handle them.
  • A license number that is missing or does not check out.
  • A large payment due before any work is done.
  • Pressure to sign today to "lock in" a price.

One of these is a reason to ask a question. Several together are a reason to keep looking. A contractor who is proud of the estimate will walk you through it. If a bid is hard to read, ask the contractor to rewrite it in plain words, and notice how they react.

How a Hildebrand estimate is built

Every Hildebrand job is quoted after an on-site visit. The estimate is free and in writing, with the scope, materials, timeline and warranty spelled out before any work begins. It is written line by line so you can compare it against any other bid. Once you approve it, the price does not change without your written approval.

Hildebrand does not publish one-size-fits-all prices because every project is custom. The pricing page explains what moves the number, and the process page shows the five steps from first visit to final walk-through.

Questions homeowners ask

How many estimates should I get?

Many homeowners get two or three. Enough to see a pattern, not so many that every bid blurs together.

Why is one estimate so much lower than the others?

Look for a smaller scope, lower allowances, cheaper materials, excluded items or a contractor who skips something others include. Ask each one to explain.

Should I pay for an estimate?

Hildebrand's in-home consultation and written estimate are free, with no trip fee. Other contractors set their own policy, so ask before the visit.

Can I negotiate an estimate?

You can ask to change the scope or finishes to hit a budget. Be careful with a request to simply lower the price, because the work or the materials may shrink to match.

Get an estimate that is easy to compare

Free in-home consultation and written estimate from a Florida licensed contractor serving Manatee County, Sarasota County and south Hillsborough County.

Sources